google-site-verification: googlec7193c3de77668c9.html

Angelsey’s Menai Bridge to reopen fully following bolts problem

Advertisements

The Menai Suspension Bridge will reopen to two-way traffic at 07:00 BST on Friday after being closed to replace bolts on beams.

The bridge, which connects Anglesey to the north Wales mainland, reopened to single flow traffic on 7 October and with a three-tonne weight limit.

Now the bridge has been strengthened the limit has been raised to 7.5 tonnes.

There will be checks on the works every Wednesday at 10:00 when traffic will be managed with stop/go signs.

The reopening coincides with the Menai Bridge fair but more work is needed to fix the bridge permanently.

The Welsh government said updates would be provided soon.


BBC News

Views: 3

See also  Rob Jetten's centrist liberals lead Dutch election, exit poll says

Check Also

Mimi Xu: Expectation a privilege for Wales’ teenage tennis star

Xu will likely play in qualifiers at Ilkey, Nottingham, Eastbourne and Roehampton, but the postcode …

Siom wrth i Gymru golli yn Rwmania

Colli o 2-1 wnaeth tîm dynion Cymru yn eu gêm gyfeillgar yn erbyn Rwmania yn …

'My great-grandad saved your life' – Aberfan survivor left stunned on school visit

An Aberfan disaster survivor met the great-grandson of the caretaker who pulled him from the …

Leave a Reply

Available for Amazon Prime
heavy equipment transport westmoreland pa. Just a moment.... 429 too many requests.