google-site-verification: googlec7193c3de77668c9.html

A83 reopens after landslides blocked the road

Advertisements
Bear Scotland A mudslide has blocked a road with debris and flowing water, surrounded by lush greenery and a winding road visible in the background.Bear Scotland

Debris blocked the A83 in both directions near Butterbridge

The A83 in Argyll has reopened after the area was hit by 11 landslides in one morning.

Drivers faced a 60-mile detour when the road was closed on Monday between Ardgartan and the A815 Dunoon road, near the Rest and be Thankful.

Bear Scotland said five hours of heavy rain around Butterbridge and Glen Kinglas had caused the landslides.

The road reopened at 09:30 on Tuesday, following a clean-up operation and safety inspections.

Bear Scotland said two landslides reached the carriageway and blocked the road, while a third was contained by a roadside barrier.

When the A83 is closed, the nearby Old Military Road is usually opened to traffic.

However, on Monday it was also blocked by the landslides, requiring the 59-mile (95km) diversion via Crianlarich.

Bear Scotland A muddy slope with flowing water and a debris path obscuring part of the road, marked by directional black and white signs.Bear Scotland

Eleven landslides were recorded along the stretch, with two reaching the road

Geotechnical engineers assessed the area and debris was removed from the trunk road and ditches.

Traffic lights are still in place at the Rest and Be Thankful and at Glen Kinglas.

Euan Scott, from Bear Scotland, said teams had been working hard to clear the debris over the last 24 hours.

He added: “We will continue to monitor hillside conditions over the next few days and thank the community and road users for their patience.”

Transport Scotland Artist impression of tunnel at the Rest and be Thankful landslip-prone roadTransport Scotland

An artist impression of the mile-long tunnel which will be built to stop the road being closed because of landslides

The A83 is an almost 100-mile (161km) trunk road connecting the Mull of Kintyre and southern Argyll to the shores of Loch Lomond.

More than a million vehicles travel the route every year and it acts as an important transport link for mainland Argyll as well as the Inner Hebrides.

The Rest and Be Thankful section – a steep climb out of Glen Croe near Arrochar – is vulnerable to landslides and was closed for a total of 200 days in 2020.

In 2023, the national transport agency Transport Scotland unveiled plans for a mile-long tunnel, costing up to £470m, to protect vehicles from landslides.

The Rest and Be Thankful got its name because travellers and drivers would stop at the top of the 800ft climb to catch their breath.


BBC News

Views: 0

See also  The band telling the history of a city by songs

Check Also

Man charged over alleged assault in block of Edinburgh flats

A man has been charged in connection with a serious assault that left another man …

In pictures: Glasgow Pride 2026

Thousands of people gathered in Glasgow on Saturday to take part in the city’s annual …

Scotland flirt with defeat before beating Fiji

Scotland had made 14 changes from the side that went so gallantly against South Africaq …

Leave a Reply

Available for Amazon Prime